Quality, health, safety and environment
Safety is part of the plan, not an appendix. Every project is engineered, supervised and reviewed against three policies signed by our General Manager.
Our policies
ID 5.2-1
Quality policy
On time, undamaged, fully documented: how we plan, deliver and improve every move.
Download PDFID 5.2-2
Health and safety policy
Zero harm: risk assessment before every operation, stop work authority, supervised lifts.
Download PDFID 5.2-3
Environmental policy
Fewer empty runs and less waste, no spills, licensed disposal of dunnage and packing.
Download PDFHow it works on site
Every move we plan starts with the question of what could go wrong, and who could get hurt. We would rather spend a day on the plan than an hour on an incident report.
- Risk assessed before every moveRoute surveys, lift plans and method statements are approved before cargo is touched.
- Stop-work authorityAnyone on site, ours or a subcontractor's, can stop an operation they believe is unsafe.
- Qualified partners onlyHauliers, crane and lashing contractors are pre-qualified on safety record, equipment and insurance.
- Supervision on siteOur people attend critical lifts, loading and discharge, and report incidents and near misses the same day.
- EnvironmentWe plan routes and stowage to cut empty runs and fuel, and dispose of dunnage and packing responsibly.
- Local complianceOperations in the UAE follow federal regulations and the Abu Dhabi OSHAD framework.
Prequalifying us for a project?
Send us your HSE questionnaire. We return it completed, with the supporting documents.
